Refinery capacity available for long term contracts in multiple geographic locations

Refinery Capacity


Refinery capacity available for long term contracts in multiple geographic locations

Refinery Capacity


Service

Currently in Use

Distributor

Used

ISO

Sea Freight

Price:

To be discussed Confidential

Shipping:

Sea freight

Delivery Time:

9 Weeks

Note:

Refining capacity for crude oil

Technical Specifications

Condition New
Material Super duplex
Price To be discussed
Company Type E&P Company
Transaction Type Service
Weight Based on contract
Location Canada
Quality Assurance ASME
Shipping Sea freight

Features and Benefits

  • Lower capital cost
  • Quick time to finished product
  • Multiple facilities available
  • Geographic locations based on logistic and processing requirements

Print or Share

Do you need information for the team or a client? Download these page to add your dossier.

Send an email with the link to this page. It's a great way to share information.


Detailed Description

Construction timelines for a modular refinery can range from 12 to 18 months from the start of a project to the first barrel of oil processed. It is time and cost efficient to utilise space in existing refining and storage facilities.