Refinery capacity available for long term contracts in multiple geographic locations
Refinery Capacity
![](https://mothership.ballycatter.com/content_product/refinery.jpg)
![](https://mothership.ballycatter.com/content_product/refinery.jpg)
Refinery capacity available for long term contracts in multiple geographic locations
Refinery Capacity
Sign in
Welcome back
Sign up
Sign-up and make easy contact all providers in the industry.
Let's create your free account
Technical Specifications
Features and Benefits
- Lower capital cost
- Quick time to finished product
- Multiple facilities available
- Geographic locations based on logistic and processing requirements
Print or Share
Do you need information for the team or a client? Download these page to add your dossier.
Send an email with the link to this page. It's a great way to share information.
Detailed Description
Construction timelines for a modular refinery can range from 12 to 18 months from the start of a project to the first barrel of oil processed. It is time and cost efficient to utilise space in existing refining and storage facilities.